AS9100 software · Design and manufacturing
AS9100 software for aerospace design and manufacturing
From the design plan to the part that ships, every gate in an AS9100 job leaves a record behind. JinxQMS keeps those records complete and in order, on the forms you’re already certified on, so an audit becomes a walk through work that’s already documented.
Job 24-0912 · interior refurbishment data package
Done
Design plan
Signed by engineering and sales
Done
Design reviews
Flammability and structures reviews recorded
Done
DER approval
Form 8110-3 filed with drawing 1042-201 Rev B
Done
Data package released
Rev B, approvals attached
In progress
Production and inspection
Inspection report in work
Next
First article (AS9102)
Due with the first shipment
Design control that holds up in an audit.
Design jobs are where the paperwork gets complicated: reviews with outside DERs, approvals that cover specific aircraft, drawings that change. JinxQMS keeps each design job’s plan, reviews and approvals together.
- Design plans and design reviews on your own forms
- DER and FAA approval documents filed with the drawings they approve
- Released data packages, with every earlier revision kept
Caught before it left the building.
Before each step is filed, the pre-submission review reads its paperwork against the rest of the job, scanned pages included. These are real catches at Jenkins Certification, an AS9100 design and fabrication shop:
- Caught: An aircraft missing from an approval
- Caught: Errors on drawings
- Caught: Typos in reports
Advisory only: your team decides what to fix.
The customer’s requirements, on every job.
Flow-downs from the customer’s PO and quality clauses, first article requirements included, are listed word for word. Your team confirms what applies, and the job is checked against every one of them before it ships.
A requirement your team rules out stays on the record with who ruled it out and why, which is exactly what an auditor asks to see.
The rest of your AS9100 system, in one place.
Production and inspection
Your production orders and inspection reports, filed with the job.
First article inspection
AS9102 reports in one register, linked to the job they belong to.
Corrective action
Nonconformances, CAPA and supplier corrective action requests, tracked to closure.
Risk and management review
A risk register and management reviews, kept as records your auditor can read.
Internal audits
Audits run from checklists, with findings tracked until they close.
Training and tooling
Training records and calibrated tooling, with alerts before anything comes due.
From a customer
“It wouldn’t raise my blood pressure if an auditor showed up tomorrow.”
AS9100 questions, answered.
Does JinxQMS handle design work with DER approvals?
Yes. Design plans and reviews run on your own forms, and DER and FAA approval documents are filed with the drawings they approve.
Does it support AS9102 first article inspection?
Yes. First article inspection reports live in their own register and are linked to the job they belong to.
We do design and fabrication. Is that two systems?
No. Design jobs, fabrication jobs and jobs that do both run in one system, each through its own steps.
Other standards:AS9110 softwareAS9120 softwarePart 145 softwareIA9100
See it run your AS9100 system.
Talk to an aerospace quality expert — we respond within one business day.
or call(844) JINXQMS844-546-9767